Print this page

ALL-STATE STUD PLUS

A cost-effective electrode used to remove broken studs, bolts and taps from holes. A thick slag protects the threads.

Features

AC/DC reverse electrode specially formulated for easy removal of broken studs and bolts.

Classifications

Properties

Typical Properties
Typical Mechanical Properties  
Tensile Strength 120 to 180 ksi

Part No.

STUD PLUS
Part No. Model / Product Description UPC
69001015 A/S STUD PLUS KIT 662393000106
69001018 A/S *STUD PLUS 1/8 DISP PAK 662303065577
69200002 A/S STUD PLUS 3/32X9X3#VALP 662393005446
69200003 A/S STUD PLUS 1/8X14X3#X24# 662393005453
69200005 A/S STUD PLUS 5/32X14X5X40 662393005460
69200006 A/S STUD PLUS 3/32X9X5X20 662393005477
69200007 A/S STUD PLUS 1/8X14X5X40 662393005484
69201005 A/S STUD PLUS 5/32X14X1#TUBE 662393005606
69201006 A/S STUD PLUS 3/32X9X1#TUBE 662393005613
69201007 A/S STUD PLUS 1/8X14X1# TUBE 662393005620
69230005 A/S STUD PLUS 5/32X14X3X24 662393005958

SAW

Accessories

Depositions/Paramaters

Extra Info

Works on all steel fasterners-Grade 5, Grade 8, even case hardened. Special Flux solidifies to protect threads during the build-up operation.

Procedure

Choose correct size of electrode to suit cavity diameter. Set amperage according to: Up to 3/8"(9.5mm) use 3/32" (2.4mm) at 50-75 amps; From 3/8" to 1/2"(9.5mm-13mm) use 1/8"(3.2mm) at 80-120 amps; For diameters over 1/2"(13mm) use 5/32"(4.0mm)at 100-140 amps. Strike arc precisely in center of boken stud and begin build-up.Take your time.Continue re-striking "dead center" on build-up. Building-up deposit off-center will cause stud to be welded to sides of cavity. Do not overheat. Allow build-up to cool. Before building deposit above top of cavity,allow weld deposit to cool. This precaution will help avoid welding deposit to top edges of cavity. Carefully chip away only top center of slag. Build-up enough deposit above top edge of cavity to be able to weld a nut and washer to deposit without welding them to part edges. Allow deposit to cool slightly. Weld a washer and nut of same or smaller size to built-up column of metal to center of deposit. Do not weld nut and washer to part edges. Allow assembly to cool before using a wrench, or appropriate tool to unscrew broken part. If there are any problems removing broken part, weld deposit build-up was probably improperly centered in cavity. Slag is easily chased from cavity by using a tap.

Complementary Products

Seismic Data

All listed prices are in U.S. dollars and represent the Manufacturer's Suggested Retail Price (MSRP) for sale in the United States. Actual selling price will be determined by the Distributor. Prices are subject to change without notice.